DEPENDING UP ON PREVIOUS PRE SET FACTOR COVERAGE OF THE DEVIC IS DECIDED BASED ON . . .

  1. Height of the Lightning Arrester.
    • The height of the air terminal above the protected structure directly influences the achievable protection area.

    • Coverage should be evaluated at the actual installation height, not simply from the arrester's overall length.

  2. Class/Level of Lightning Protection Required.
    • The required Lightning Protection Level (LPL I, II, III or IV) affects the design parameters.

    • Higher-risk structures generally require more stringent protection.

  3. Protection Method Used.
    • Coverage depends on whether the system uses a conventional Franklin-type air terminal, Early Streamer Emission (ESE) air terminal, or another engineered arrangement.

    • Different methods use different calculation approaches.

  4. Building Dimensions and Geometry.
    • Building height, length, width, roof shape, parapet walls and projections must be considered.

    • Complex structures may require multiple air terminals rather than relying on one terminal.

  5. Angle of protection.
    • For conventional lightning protection, the applicable design method and protection class determine the protected zone depending on the angle of protection.

    • The rolling sphere method is particularly useful for checking whether exposed points are adequately protected or not .

  6. Relative Height of Nearby Objects
    • Water tanks, solar panels, chimneys, antennas, HVAC equipment, towers and other rooftop structures can become potential lightning attachment points.

    • These objects must be incorporated into the protection design.

  7. Location and Exposure of the Structure
    • An isolated building on open terrain is more exposed than a building surrounded by taller structures.

    • Local topography and surrounding structures can influence lightning exposure.

  8. Required Risk Level
    • The consequences of a lightning strike should be assessed, including risks to people, equipment, business continuity and fire safety.

    • Critical facilities may require a higher level of protection.

  9. Down-Conductor Arrangement
    • Adequate protection is not determined by the air terminal alone.

    • The complete system—including air terminals, down conductors, earth termination and equipotential bonding—must be properly designed.

  10. Earthing and Soil Conditions
  • Soil resistivity, electrode configuration and earth-termination design influence the overall effectiveness of the lightning protection system.

  • Lightning current needs a low-impedance path to earth.

FACTORS UNDER CONSIDERATION . . .